LAARS FTHF 199 CASCADE Piping and Wiring

LAARS FTHF 199 CASCADE Piping and Wiring

Attached is the new cascade piping and wiring diagrams manual (publication 1349C) for LAARS FTHF 199 Floor Boiler. 

Pay particular attention to page 4 of this manual as this shows the position of the internal valves when PIPED cascaded ! I have attached the "cascade manual " here in attachments to this article. 

EXAMPLE Direct from the manual:
Factory default valve position: V1 and V3 open, V2 closed (single boiler). For cascade operation with boiler pump: Close V1 and V3. Open V2.


Additionally the cascade wiring and piping configurations are pages 8-15 of the same manual.

Cascade programming and cascade cable installation are pages 22-32 of the same manual.