LAARS FTHF 199 CASCADE Piping and Wiring
Attached is the new cascade piping and wiring diagrams manual (publication 1349C) for LAARS FTHF 199 Floor Boiler.
Pay particular attention to page 4 of this manual as this shows the position of the internal valves when PIPED cascaded ! I have attached the "cascade manual " here in attachments to this article.
EXAMPLE Direct from the manual:
Factory default valve position:
V1 and V3 open, V2 closed (single boiler).
For cascade operation with boiler pump:
Close V1 and V3. Open V2.
Additionally the cascade wiring and piping configurations are pages 8-15 of the same manual.
Cascade programming and cascade cable installation are pages 22-32 of the same manual.